Phase 1C (Contract 2)
Gravity and Pressure Sewer Areas
As sewer installation is completed, contractor will be installing lateral services and following this work these areas may still require site restoration and cleanup.
- Wheldon Way
- Village Landing
- Janes Way
- Earles Way
- Spinnaker Lane
- Oyster Bluff
- Absegami Run
- Tabitha Terrace
- Oyster Pond Lane
- Shattuck Place
- Shattuck Lane
- Grist Mill Lane
- Tide Mill Lane
- Wineberry Way
- Inlet Road
- Independence Lane
Water Main Work
In addition, water main work will occur on portions of the following roads:
- Wheldon Way
- Janes Way
- Earles Way
- Tabitha Terrace
This work will include removal and installation of new water main and reconnection of water services. Temporary water services may be required depending on utility conflicts. In addition there may be water service replacements made on other roads not listed under water main work, but identified for sewer work to replace old steel services.
Stormwater Improvements
As part of the Town's sewer infrastructure projects, the Town is also installing new stormwater systems in the following areas:
- Inlet Road
- Oyster Pond Furlong (between Town Landing and Absegami Run)
- Oyster Pond Furlong Town Landing
Gas Utilities
National Grid is currently working on natural gas main work in Town at the following locations near the sewer project. This work is unrelated to the Town's sewer projects.
|