Town of Chatham Collection System Construction Project
Welcome Areas of Work Public Notices Schedule Information Contact
Links
Town of Chatham Website
Frequently Asked Questions (FAQ)
Comprehensive Management Plan
Chatham Water & Sewer
Chatham DPW
Chatham Natural Resources
Town of Chatham Website
Chatham Maps Online
Chatham Businesses

Areas of Work Map
Areas of Work Map
Click here to enlarge the map above.

Areas of Work

Contracts:

Phase 1C-2 (Contract 2017-CWMP-1)

Phase 1C-3&4 (Contract 2018-CWMP-2)

 

 

Phase 1C-2

Gravity and Pressure Sewer Areas

As sewer installation is completed, contractor will be installing lateral services and following this work these areas may still require site restoration and cleanup.

  • Wheldon Way
  • Village Landing
  • Janes Way
  • Earles Way
  • Spinnaker Lane
  • Oyster Bluff
  • Absegami Run
  • Tabitha Terrace
  • Oyster Pond Lane
  • Shattuck Place
  • Shattuck Lane
  • Grist Mill Lane
  • Tide Mill Lane
  • Wineberry Way
  • Inlet Road
  • Independence Lane

 

Water Main Work

In addition, water main work will occur on portions of the following roads:

  • Wheldon Way
  • Janes Way
  • Earles Way
  • Tabitha Terrace

This work will include removal and installation of new water main and reconnection of water services.  Temporary water services may be required depending on utility conflicts.  In addition there may be water service replacements made on other roads not listed under water main work, but identified for sewer work to replace old steel services.

Stormwater Improvements

As part of the Town's sewer infrastructure projects, the Town is also installing new stormwater systems in the following areas:

  • Inlet Road
  • Oyster Pond Furlong (between Town Landing and Absegami Run)
  • Oyster Pond Furlong Town Landing

Gas Utilities

National Grid is currently working on natural gas main work in Town at the following locations near the sewer project.   This work is unrelated to the Town's sewer projects. 

  • Inlet Road

Phase 1C-3&4

Gravity and Pressure Sewer Areas

As sewer installation is completed, contractor will be installing lateral services and following this work these areas may still require site restoration and cleanup.

  • Ethelma Drive
  • Barbara Drive
  • Cynthia Drive
  • Wilfred Road
  • Balfour Lane
  • Sky Way
  • Ell Street
  • White Pond Road
  • Waveland Avenue
  • Captain Richards Way
  • Ellis Street
  • Bay View Street
  • Carolyn Drive
  • Jeanette Drive
  • Jeanette Road
  • Perch Pond Road
  • Heritage Lane
  • Linden Tree Lane
  • Snow Lane
  • Lime Hill Road
  • Christopher Hardings Lane
  • Uncle Alberts Drive
  • Smith Street
  • Vineyard Avene

 

Water Main Work

In addition, water main work may occur on portions of the following roads:

  • Wilfred Road
  • Snow Lane
  • Captain Richards

This work will include removal and installation of new water main and reconnection of water services.  Temporary water services may be required depending on utility conflicts.  In addition there may be water service replacements made on other roads not listed under water main work, but identified for sewer work to replace old steel services.

Gas Utilities

National Grid is currently working on natural gas main work in Town various locations.

 

Town of Chatham  | MassDOT Traffic